Available are also similar pages for some earlier sessions:
3/2008, 1/2009, 2/2009, 3/2009, 1/2010, 2/2010, 3/2010, 1/2011, 2/2011, 3/2011 and 1/2012


Amplitude Calibration at Tr
in EVN Session 2/2012


Kaz Borkowski (June 18, 2012)


See also the 'Torun' entries for each experiment observed in the session feedback.
A collection of detailed station specific schedules for this session can be found in this pdf file (681 kB).





Diode Temperature Calibration

(Results of some CL-type experiments
and final rxg data)


The calibration data (Tcal) presented below are being derived nonstandard way. Because of problems described in this report normally we cannot use the otherwise very convenient EVN standard application of GNPLT (the name standing for Gain Plot). Instead, to arrive at Tcal values we analyse the calibration (cl) experiment logs with a FORTRAN program, specially developed for the purpose, that employs weighted averaging (also described in the above mentioned report) of original calibration data provided in the logs in the form of onoff measurements.


C-band measurements





L-band measurements






System Temperature at Tr Station
as produced with the antabfs.pl tool

(Click on an image to see it in a higher resolution)





C-Band Experiments


n12c2Tsys.png
n12c2
ey018bTsys.png
ey018b
em095aTsys.png
em095a
gf018aTsys.png
gf018a

ep075cTsys.png
ep075c



L-Band Experiments


em095bTsys.png
em095b
em095cTsys.png
em095c
ed038Tsys.png
ed038
ep075dTsys.png
ep075d

ep083Tsys.png
ep083
ey015cTsys.png
ey015c
gf018bTsys.png
gf018b


Created with the help of IrfanView
Last revised: June 18, 2012